Pitch 3.50 3.81mm PCB Plug socket Terminal Block Flanged
MAIN FEATURES
Pitch |
3.50/3.81mm |
Color |
Green |
Poles |
2p-24p |
Connection direction |
0° |
Connection method |
Screw connection |
Screw type |
Slotted |
Temperature rise |
Low |
TECHNICAL DATA
Standard Data |
UL Standard(UL1059) |
IEC Standard(IEC61984) |
UL application group |
IEC overvoltage catepory/pollution degree |
B |
C |
D |
III/3 |
III/2 |
II/2 |
Rated voltage |
300V |
- |
300V |
- |
- |
250V |
Rated current |
8A |
- |
8A |
- |
- |
7A |
Material |
Insulation Material |
PA66 ,UL94V-0 |
Material of current carrier |
copper alloy,Tin plated |
Screw |
Steel,M2.0,Zinc plated |
Cage |
Brass,Ni plated |
Electronical Performation |
Contact Resistance |
20mΩ max |
Insulation Resistance |
500MΩ at DC500V |
Withstand voltage |
2KV for 1min |
Connection Capacity |
Torque |
0.2N.m |
Strip length |
6.0-7.0mm |
Rated connection capacity |
28-16AWG (Sol&Str) ,0.5-1.5mm² |
Ambient Conditions |
Operation temperature |
-40ºC to +105ºC |
Storage temperature |
-40ºC to +70ºC |
Shelf life |
1 year |
Soldering capability |
Manual |
30W iron,320±5ºC,3S max |
Wave soldering |
250±10ºC,5S max |
Environmental Compliance |
RoHS2.0,REACH |
ENVIRONMENT
We hereby confirm that all the raw materials in our product including components, parts, materials and finished products are fully conform to:
1. The EU's RoHS 2.0(Directive 2011/65/EU & EU 2015/863 )
2. 211 SVHC(Substance of Very High Concern) of EU directive of the Regulation(EC) No.1907/2006(REACH).
ITEMS
MOQ;100PCS
lead time:about 5-10 days
export port:ningbo or shanghai port
shippment terms:by sea or by air or by express
samples is free,freight collect.
best price with high quality
PRODUCT PICTURES
DRAWING
CERTIFICATE
MAIN CUSTOMER
FACTORY VIEW
SHIPPING & PAYMENT
--------------------------------------------------------------------
1. FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to- Door.
2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.
3.Delivery Time: 3-7 days for samples; 10-30 days for Mass production.
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.