• Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps
  • Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps

Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps

Material: Metal
Usage: Pipe Clamp
Structure: G Clamp
Standard: Standard
Condition: New
Brand: OEM
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
CLP030
Material Spec.
20*1.0mm
Delivery Time
15days
OEM
Ok
MOQ
1000PCS
Surface
Zinc Plated
Size
All Size
Export Port
Ningbo
Transport Package
Bulk+Carton+Pallet
Specification
63-200mm
Trademark
Non
Origin
China
Production Capacity
5000000PCS/Year

Product Description

M7 light pipe clamp for fixed clip hardwarer hose clamp carbon steel with zinc plated
material:carbon steel with zinc plated 20*1.5mm
M6*20 egde scew
export:ningbo or shanghai port
MOQ:1000PCS
delivery time:15 days
oem is ok
Dia. inch thicken(mm)
22-25 1/2" 1.0*20
28-32 3/4" 1.0*20
35-38 1" 1.0*20
48-55 1-1/2" 1.0*20
60-63 2" 1.0*20
75-80 2-1/2" 1.0*20
90-100 3" 1.0*20
110 3-1/2" 1.0*20
115-125 4" 1.0*20

Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps
Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps


Hardware Supplier Carbon Steel Zinc Plated M8 Nail Pipe Clamps
SHIPPING & PAYMENT
--------------------------------------------------------------------

 
1.FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to-Door.

2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.

3. Delivery Time: 3-7 days for samples; 10-30 days for Mass production.

 
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.

Send your message to this supplier

*From:
*To:
avatar Mrs. Amy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now