Hardware China U Style Insulated Double Pipe Clamps Set

  • Audited Supplier
  • 9 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • OEM & ODM Support: Custom logo printing on products and cartons is available.
  • 15 Years Warranty: Comprehensive warranty coverage for product quality assurance.
  • Low MOQ: Minimum order quantity starts from just 1 piece.
  • Fast Sample Delivery: Samples delivered within 3-7 days via express couriers.
  • Carbon Steel Material: Made of durable carbon steel with yellow zinc plating.
  • Multiple Payment Options: Supports L/C, T/T, Western Union, and PayPal.
  • Flexible Shipping: Options for sea or air freight based on urgency.
  • 12-Hour Response: Quick reply within 12 hours with 24-hour standby.

Product Images of Hardware China U Style Insulated Double Pipe Clamps Set

Hardware China U Style Insulated Double Pipe Clamps Set pictures & photos
Hardware China U Style Insulated Double Pipe Clamps Set
Hardware China U Style Insulated Double Pipe Clamps Set pictures & photos
Hardware China U Style Insulated Double Pipe Clamps Set
  • Hardware China U Style Insulated Double Pipe Clamps Set
    Hardware China U Style Insulated Double Pipe Clamps Set
  • Hardware China U Style Insulated Double Pipe Clamps Set
    Hardware China U Style Insulated Double Pipe Clamps Set

Find Similar Products

Product Description

China U Style Insulated Double Pipe Clamps Set hardware yellow color carbon steel 
material:carbon steel with yellow zinc plated 
export port:ningbo or shanghai port
MOQ:1PCS
DELIVERY TIME:5-30 DAYS
OEM IS OK
size set/ctn measurement weight/ctn
1/2" 200 390*260*240 15KG
3/4" 200 390*260*240 17KG

1.Packaging:

Inner packaging: Bubble bag, cloth bag, white color or designed color box as customers' requirement.
 

2.Shipping :

We have the long-term cooperation shipping company, shipping is fast, safety, unbroken.

In general, we transfer goods by sea to save cost. If you are urgent, we can consider by air.  

3.Delivery Details:

 In general, 20ft container: 30-35 days.40ft container: 35-40 days


Hardware China U Style Insulated Double Pipe Clamps Set

Hardware China U Style Insulated Double Pipe Clamps Set

Our ServiceHardware China U Style Insulated Double Pipe Clamps Set

1.Quickly reply within 12 hours

  24hours standby. Crtical listen to your suggestion or demand and feedback ASAP. Your inquiry related to our products or prices will be replied in 12hours.

2.Best price $service for you

     We are a supplier  of clamps,manifold brackets,water meter brackets, shower tray brackets,radiator brackets,etc.We offer best production capability,best quality control,best services,no agent and no distributers.

3.Detailed and professional specifications and guidance of products.

    We value the quality first,as a professional manufacture,we can be your strong support with good product and 15years warranty.

4.OEM & ODM available.

  1) Your logo can be on the products or cartons.

  2) Your product will be assured by our quality control dept.

5.Best After-sales Service for you.

Any problem about product quality during the warranty period, please get back to us,we'll ship the replacement or a new one for you.

Hardware China U Style Insulated Double Pipe Clamps Set
SHIPPING & PAYMENT
--------------------------------------------------------------------

 
1.FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to-Door.

2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.

3. Delivery Time: 3-7 days for samples; 10-30 days for Mass production.

 
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.

About the Supplier

Watch Video
Watch Video
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.
Cixi Ciliang Electronic Co., Ltd.

About Our Factory & Business Background

Address
B128 Xisanhuan North Road Number 600 Zonghan Street, Cixi, Ningbo, Zhejiang, China
Terms of Payment
LC, T/T, PayPal
International Commercial Terms(Incoterms)
FOB, EXW, CFR, CIF, DDP
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Nearest Port
NINGBO PORT, SHANGHAI PORT

Our Production Capability & Technical Expertise

Main Products
Terminal Blocks, Ceramic Terminal Blocks, Busbar Terminal Blocks, Quick Wiring Connectors, Pin Header & Female Header, Heatsinks, Wire Harnesses

Our Industry Experience & Global Business Record

Export Year
2009-12-10
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the minimum order quantity?
The MOQ is 1 piece.
Can I customize the product with my logo?
Yes, OEM and ODM are available. Your logo can be printed on the products or cartons.
What is the warranty period?
We provide a 15-year warranty for our products.
How long does delivery take?
Sample delivery takes 3-7 days. Mass production takes 10-30 days. Container shipments take 30-40 days.
What payment methods do you accept?
We accept L/C, T/T, Western Union, and PayPal.
What is the material of the pipe clamps?
The material is carbon steel with yellow zinc plating.
How is the product packaged?
Packaging includes bubble bags, cloth bags, or white/design color boxes as per customer requirements.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now