3.5mm 3.81mm pitch Spring Fast Connector pluggable Plug PCB Terminal Block
MAIN FEATURES
| Pitch |
3.50/3.81mm |
| Color |
Green |
| Poles |
2p-24p |
| Connection direction |
90° |
| Connection method |
Push-in spring connection |
| Temperature rise |
Low |
TECHNICAL DATA
| Standard Data |
UL Standard(UL1059) |
IEC Standard(IEC61984) |
| UL application group |
IEC overvoltage catepory /pollution degree |
| B |
C |
D |
III/3 |
III/2 |
II/2 |
| Rated voltage |
300V |
- |
300V |
- |
250V |
- |
| Rated current |
8A |
- |
8A |
- |
8A |
- |
| Material |
| Insulation Material |
PA66 ,UL94V-0 |
| Material of current carrier |
copper alloy,Tin plated |
| Material of Spring |
Stainless |
| Electronical Performation |
| Contact Resistance |
20mΩ max |
| Insulation Resistance |
500MΩ at DC500V |
| Withstand voltage |
AC 1.5KV for 1min |
| Connection Capacity |
| Strip length |
8.0-9.0mm |
| Rated connection capacity |
24-16AWG (Sol&Str) ,0.5-1.5mm² |
| Ambient Conditions |
| Operation temperature |
-40ºC to +105ºC |
| Storage temperature |
-40ºC to +70ºC |
| Shelf life |
1 year |
| Soldering capability |
| Manual |
\ |
| Wave soldering |
\ |
| Environmental Compliance |
| RoHS2.0,REACH |
ENVIRONMENT
We hereby confirm that all the raw materials in our product including components, parts, materials and finished products are fully conform to:
1. The EU's RoHS 2.0(Directive 2011/65/EU & EU 2015/863 )
2. 211 SVHC(Substance of Very High Concern) of EU directive of the Regulation(EC) No.1907/2006(REACH).
ITEMS
MOQ;100PCS
lead time:about 5-10 days
export port:ningbo or shanghai port
shippment terms:by sea or by air or by express
samples is free,freight collect.
best price with high quality
PRODUCT PICTURES
DRAWING
CERTIFICATE

MAIN CUSTOMER

FACTORY VIEW
SHIPPING & PAYMENT
--------------------------------------------------------------------
1. FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to- Door.
2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.
3.Delivery Time: 3-7 days for samples; 10-30 days for Mass production.
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.