• Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
  • Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
  • Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
  • Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
  • Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
  • Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp

Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp

Material: Metal
Usage: Heavy Duty Clamp
Structure: U Clamp
Standard: Standard
Condition: New
Brand: OEM
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
HS121
Delivery Time
15 Days
MOQ
100PCS
Transport Package
Bulk+Pallet
Specification
M4-11
Trademark
Non
Origin
China
Production Capacity
5000000PCS/Year

Product Description

hardware Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
material:carbon steel with zinc plated
export port:ningbo or shanghai port
delivery time:about 7 days
MOQ:100PCS
size:M4-M11


Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp

Carbon Steel Support Device Double Bolt Heavy Duty Single Pipe Clamp
SHIPPING & PAYMENT
--------------------------------------------------------------------

 
1.FedEx/DHL/TNT/UPS/EMS/SF for samples, Door-to-Door.

2. By Air or by Sea for Mass production.
Customers specifying freight forwarders or negotiable shipping methods.

3. Delivery Time: 3-7 days for samples; 10-30 days for Mass production.

 
4.Payment Detail: L/C, T/T, Western union, Paypal, or other methods.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now